Historic City Centre · ANTAKYA, HATAY
District 4, Parcel 2437 — Measured Survey + Restitution + Reconstruction Project
The project covers the debris survey, restitution and reconstruction of the completely collapsed building on parcel 2437 in District 4. The foundation and wall traces uncovered on the excavation site, the walls of the neighbouring parcels, the ground levels and the material remains were measured and documented.
- Location
- District 4, Parcel 2437
- Typology
- HOUSE
- Project type
- MEASURED SURVEY + RESTITUTION + RECONSTRUCTION
- Status
- COMPLETELY COLLAPSED · EXCAVATION SURVEY AND PROJECTS COMPLETED
- Year
- 2026
About the Project
The project covers the debris survey, restitution and reconstruction of the completely collapsed building on parcel 2437 in District 4. The foundation and wall traces uncovered on the excavation site, the walls of the neighbouring parcels, the ground levels and the material remains were measured and documented.
At the restitution stage, the excavation data, the surviving building traces and the typology of the traditional Antakya house were assessed together to reread the sequence of spaces around the courtyard and the organisation of floors and roof. The reconstruction project turns this data into a building whole consistent with the original plan character, the stone walls and the timber floor and roof system.
Urban Context
Parcel 2437 in District 4 lies within the historic residential fabric running up to the foot of the mountain in Antakya, between a narrow street and the surrounding blocks of courtyard buildings. After the earthquake the main building on the parcel collapsed entirely, and the neighbouring stone walls, foundation traces and courtyard levels remain the principal physical data through which the memory of the city can still be read. The scale of the street, the topography, the neighbouring parcels and the surviving trees within the parcel form the context of the restitution and reconstruction decisions.

The Project in Numbers
District 4, Antakya
Ground floor and first floor
Debris survey, restitution and reconstruction
The demolition site, its surroundings and the street
Project Process
Debris Survey — Excavation and Building Traces
The debris survey documents the foundation boundaries still legible within the parcel, the wall remains, ground levels and the relationship with the neighbouring parcels of this completely collapsed building. The excavation plan records the position and continuity of the surviving traces within a common measurement system.
The sections and elevations distinguish the topography of the excavation surface, the traces of party walls, rubble-stone bonding and the remains of masonry foundations; the site photographs serve as the visual record of the physical findings in the drawings.
Selected excavation plans and sections from the debris survey


BasisOn-site measurement · excavation and foundation traces · party walls · site photographs
Restitution — The Original Building Configuration
The restitution assesses the foundation and wall traces documented in the debris survey together with the parcel geometry and the spatial order that the traditional Antakya house develops around its courtyard. The circulation of the ground and first floors, the sequences of rooms and the service units are reread according to the original configuration.
The stone walls, arched timber joinery, the proportions of the doors and windows, the timber floors and the hipped roof have been turned into an integrated restitution proposal, following the traces on site and the architectural character of the period.
Selected plans and sections from the restitution sheet


BasisExcavation survey · surviving building traces · parcel data · typological comparisons
Reconstruction — Rebuilding the House
The reconstruction project rebuilds the courtyard-house configuration established in the restitution, together with current building-safety requirements. The ground and first floor rooms, the vertical circulation and the service units are arranged in keeping with the original scheme.
The stone masonry walls, ashlar surrounds and arches, timber door and window joinery, timber floors and ceilings and the tile-clad hipped roof together reproduce the historical character of the building and its continuity in the street silhouette.
Selected plans and sections from the reconstruction project


BasisRestitution decisions · the original plan scheme · traditional materials and building techniques
Project Sheets
Debris Survey and Restitution — From Trace to Reconstruction
A selection reaching from the excavation findings to the original plan and building character
- EXCAVATION PLAN
- EXCAVATION FINDINGS
- RESTITUTION — FIRST FLOOR
- RESTITUTION — NORTHWEST ELEVATION
Reconstruction — Plans, Roof and Elevations
Floor, roof and section drawings of the traditional house to be rebuilt
- GROUND FLOOR PLAN
- FIRST FLOOR PLAN
- ROOF PLAN
- SECTION B–B
Project Team
- Yonca Yılmaz Çelebi
M.Arch · Conservation Specialist - Burcu Özlüoğlu
Architect - Eda Yabancı
Conservator
Method and Sources
The sequence followed in this file — documentation, diagnosis, evidence-based restitution, repair with minimum intervention — is the established method of the conservation literature. Intervention decisions were taken on the principles that repair must not begin before the cause of damage has been diagnosed, and that the degree of intervention rises from consolidation towards reconstruction only as far as necessity requires. For the theoretical framework see Zeynep Ahunbay, Tarihi Çevre Koruma ve Restorasyon (YEM Yayın, 2009); for the principles, the Venice Charter (1964), the Nara Document on Authenticity (1994) and Turkish Law No. 2863 on the Conservation of Cultural and Natural Property.
Services applied in this project
Related projects
View the project in presentation format
The submitted drawings, process account and typology cards for this parcel are available at full resolution in the horizontal presentation on the site.
Restoration / Architecture · Design and Construction