YOY Mimarlık & Tasarım Ltd. Şti. Restoration / Architecture · Design and Construction

Historic City Centre · ANTAKYA, HATAY

District 3, Parcel 357 — Reconstruction Project

The project covers the excavation survey, restitution and reconstruction of the building. The foundation and building traces uncovered by the excavation are assessed together with photographs, measurements and archival research to form the restitution decisions, and the reconstruction projects are prepared in the light of the resulting data.

Location
District 3, Parcel 357
Typology
HOUSE + COMMERCIAL
Project type
RECONSTRUCTION
Status
COMPLETELY COLLAPSED · EXCAVATION SURVEY COMPLETED
Year
2024
Scales
1/500 · 1/200 · 1/100 · 1/50
Approving authority
Hatay Regional Board for the Conservation of Cultural Property
District 3, Parcel 357 — Reconstruction Project — Günlü Sokak · northeast elevation
Günlü Sokak · northeast elevation

About the Project

The project covers the excavation survey, restitution and reconstruction of the building. The foundation and building traces uncovered by the excavation are assessed together with photographs, measurements and archival research to form the restitution decisions, and the reconstruction projects are prepared in the light of the resulting data.

Urban Context

Parcel 357 in District 3 lies within the area covered by the Conservation-Oriented Development Plan of the Antakya Historic City Centre. Because a large number of immovable cultural properties stand in its immediate surroundings, the building has been assessed within the integrity of the historic fabric. Conservation and design decisions were therefore developed with regard to the facade silhouette, the building height and the relationships with street and courtyard.

The historic fabric of Antakya — aerial photograph after the earthquake
The historic fabric of Antakya — aerial photograph after the earthquake
Uzun Çarşı and the banks of the Orontes — urban context
Uzun Çarşı and the banks of the Orontes — urban context
Conservation plan for the Historic City Centre — distribution of phases
Conservation plan for the Historic City Centre — distribution of phases

The Project in Numbers

357
parcel

District 3, Antakya

18
sheets

Scaled restitution drawings

06
stages

From assessment to construction

1/50
scale

Closest working scale

Project Process

01

Condition Assessment

After the February 2023 earthquakes the building, which stood within the Antakya Urban Conservation Area, collapsed entirely, and its debris was sorted and removed from the site. The work therefore does not constitute a damage assessment in the conventional sense: it was conceived as a condition assessment focused on documenting the traces surviving at foundation level rather than any standing architectural elements. The spatial organisation, plan scheme and original architectural features of the building were reread and recorded by assessing together the foundation traces, the material remains identified in the debris field, oral history studies and written and visual archival documents. The aim was thus to document systematically the material and documentary traces of a cultural property that no longer exists.

The courtyard elevation before the collapse — archive photograph
The courtyard elevation before the collapse — archive photograph

BasisVenice Charter art. 16 · Law No. 2863 · Regional Conservation Board notification

Project Sheets

Excavation Survey Sheets

Scaled documentation of the traces revealed during debris removal

  • Cadastral Situation
  • Site Plan
  • Excavation Plan
  • Section AA
  • Section BB

Restitution — Plans

Evidence-based redrawing of the building’s original spatial organisation

  • French Sheet and Cadastral Situation
  • Site Plan
  • Ground Floor Plan
  • First Floor Plan
  • Ground Floor Structure Plan
  • First Floor Structure Plan
  • Ground Floor Ceiling Plan
  • First Floor Ceiling Plan
  • Roof Plan

Restitution — Elevations

Its place in the street silhouette and facade order

  • Günlü Sokak Elevation
  • Nazlı Çıkmazı Elevation
  • Southwest Elevation

Restitution — Sections

Vertical spatial organisation and floor relationships

  • Section AA
  • Section BB
  • Section CC
  • Section DD
  • Section EE

Reconstruction — Plans

The plan level of the document-based rebuilding decisions

  • French Sheet and Cadastral Situation
  • Site Plan
  • Ground Floor Plan
  • First Floor Plan
  • Ground Floor Structure Plan
  • First Floor Structure Plan
  • Ground Floor Ceiling Plan
  • First Floor Ceiling Plan
  • Roof Plan

Reconstruction — Elevations and Sections

Re-establishing the original building envelope and facade order

  • Günlü Sokak Elevation (Northeast Facade)
  • Nazlı Çıkmazı Elevation (Northwest Facade)
  • Section AA
  • Section BB
  • Section CC
  • Southwest Elevation
  • Section DD
  • Section EE

Project Team

  • Yonca Yılmaz Çelebi
    M.Arch · Conservation Specialist
  • Burcu Özlüoğlu
    Architect
  • Eda Yabancı
    Conservator

Method and Sources

The sequence followed in this file — documentation, diagnosis, evidence-based restitution, repair with minimum intervention — is the established method of the conservation literature. Intervention decisions were taken on the principles that repair must not begin before the cause of damage has been diagnosed, and that the degree of intervention rises from consolidation towards reconstruction only as far as necessity requires. For the theoretical framework see Zeynep Ahunbay, Tarihi Çevre Koruma ve Restorasyon (YEM Yayın, 2009); for the principles, the Venice Charter (1964), the Nara Document on Authenticity (1994) and Turkish Law No. 2863 on the Conservation of Cultural and Natural Property.

Services applied in this project

Related projects

View the project in presentation format

The submitted drawings, process account and typology cards for this parcel are available at full resolution in the horizontal presentation on the site.