YOY Mimarlık & Tasarım Ltd. Şti. Restoration / Architecture · Design and Construction

Historic City Centre · ANTAKYA, HATAY

District 4, Parcel 1665 — Reconstruction Project

The project covers the excavation survey, restitution and reconstruction of the building. The foundation and wall traces of the structure, which collapsed entirely in the February 2023 earthquakes, were documented through an excavation survey; the 1929 French cadastral sheet, the pre-earthquake photographic archive and an oral history study were assessed together to form the restitution decisions, and the reconstruction projects were prepared in the light of the resulting data.

Location
District 4, Parcel 1665
Typology
HOUSE + COMMERCIAL
Project type
RECONSTRUCTION
Status
COMPLETELY COLLAPSED · EXCAVATION SURVEY COMPLETED
Year
2025
Scales
1/500 · 1/200 · 1/100 · 1/50 · 1/20
Approving authority
Hatay Regional Board for the Conservation of Cultural Property
District 4, Parcel 1665 — Reconstruction Project — Halk Sokak · courtyard house
Halk Sokak · courtyard house

About the Project

The project covers the excavation survey, restitution and reconstruction of the building. The foundation and wall traces of the structure, which collapsed entirely in the February 2023 earthquakes, were documented through an excavation survey; the 1929 French cadastral sheet, the pre-earthquake photographic archive and an oral history study were assessed together to form the restitution decisions, and the reconstruction projects were prepared in the light of the resulting data.

Urban Context

Parcel 1665 in District 4 lies within the area covered by the Conservation-Oriented Development Plan of the Antakya Historic City Centre. The site plan of the building, which stands on Halk Sokak adjoining its neighbouring parcels, was read from the 1929 Ville d’Antioche cadastral sheet. Because a large number of immovable cultural properties stand in its immediate surroundings, the building has been assessed within the integrity of the historic fabric, and conservation and design decisions were developed with regard to the facade silhouette, the building height and the relationships with street and courtyard.

Parcel 1665 on the 1929 Ville d’Antioche cadastral sheet
Parcel 1665 on the 1929 Ville d’Antioche cadastral sheet
Aerial photograph before the earthquake — roof layout and courtyard
Aerial photograph before the earthquake — roof layout and courtyard
Main entrance door on the Halk Sokak elevation — arched stone opening
Main entrance door on the Halk Sokak elevation — arched stone opening

The Project in Numbers

1665
parcel

District 4, Antakya

47
drawings

Separated from three submitted sheets

139
m² courtyard

The stone courtyard at the centre of the house

1/20
scale

Closest working scale

Project Process

01

Condition Assessment

After the February 2023 earthquakes the building, which stood within the Antakya Urban Conservation Area, collapsed entirely, and its debris was sorted and removed from the site. The work therefore does not constitute a damage assessment in the conventional sense: it was conceived as a condition assessment focused on documenting the traces surviving at foundation level rather than any standing architectural elements. The spatial organisation, plan scheme and original architectural features of the building were reread and recorded by assessing together the foundation traces, the material remains identified in the debris field, oral history studies and written and visual archival documents. The aim was thus to document systematically the material and documentary traces of a cultural property that no longer exists.

The existing condition after collapse — a wall stripped of its plaster and the trace of an arched opening
The existing condition after collapse — a wall stripped of its plaster and the trace of an arched opening

BasisVenice Charter art. 16 · Law No. 2863 · Regional Conservation Board notification

02

Measured Survey — Excavation Survey

As the building had collapsed completely, an excavation survey was carried out instead of a measured survey. Rather than being cleared wholesale by machine, the debris was removed under control and in layers, and the architectural data revealed in each layer was measured and photographed before removal continued.

The foundation walls, wall bases, floor levels and traces of the ashlar paving of the courtyard that were uncovered have been digitised. The sheets produced cover the French cadastral sheet and cadastral situation, the site plan, the licensed survey boundary, the excavation plan and sections AA and BB.

Drawings from the excavation survey sheet that describe this stage

EXCAVATION PLAN — District 4, Parcel 1665
EXCAVATION PLAN
SECTION AA — District 4, Parcel 1665
SECTION AA
SECTION BB — District 4, Parcel 1665
SECTION BB

BasisVenice Charter art. 16 · Charter for the Protection of the Archaeological Heritage

03

Restitution

Restitution is the evidence-based reconstruction of the building’s original state before its collapse. On this parcel the work rests on the 1929 Ville d’Antioche cadastral sheet, photographs of the courtyard and interior taken before the earthquake, the roof layout read from an aerial photograph and an oral history study.

On the sheet, every restitution decision is marked against a three-level reliability legend: decisions confirmed by traces in the building and by period documents are shown as first degree, those based on comparative study of similar buildings as second degree, and those for which there is insufficient data and which remain proposals as third degree. It therefore stays legible on the drawing which information rests on evidence and which on interpretation.

Plan and elevation decisions from the restitution sheet

GROUND FLOOR PLAN — District 4, Parcel 1665
GROUND FLOOR PLAN
HALK SOKAK ELEVATION — District 4, Parcel 1665
HALK SOKAK ELEVATION
RELIABILITY LEGEND — District 4, Parcel 1665
RELIABILITY LEGEND

BasisVenice Charter art. 9–13 · Nara Document on Authenticity

04

Restoration Decisions

As the building was no longer standing, the conservation decisions turned towards defining the original qualities of the building to be rebuilt rather than intervening in existing fabric. The walls were defined as a three-layer stone section and the internal partitions as bağdadi lath-and-plaster and brick; the courtyard and entrance were determined as ashlar paving, the ground floor rooms as cast mosaic, and the upper floor as timber flooring.

Material and construction-system decisions

WALL TYPES — District 4, Parcel 1665
WALL TYPES
ROOM SCHEDULE — District 4, Parcel 1665
ROOM SCHEDULE

BasisVenice Charter art. 9–12 · Law No. 2863

05

Reconstruction

The reconstruction project defines the rebuilding of the original configuration established in the restitution, together with current building-safety requirements. The entrance, courtyard, two rooms, office, kitchen and plant room on the ground floor, and the hall, five rooms and wet spaces above, have all been rebuilt in keeping with the original plan scheme.

The 139 m² area of the courtyard, its ashlar paving and the sequence of spaces around it have been preserved; the upper-floor timber gallery and the hipped roof have been redefined with their original pitch and eaves arrangement.

Elevations and sections from the reconstruction sheet

HALK SOKAK ELEVATION — District 4, Parcel 1665
HALK SOKAK ELEVATION
SECTION AA — District 4, Parcel 1665
SECTION AA
ROOF PLAN — District 4, Parcel 1665
ROOF PLAN

BasisVenice Charter art. 15 · Riga Charter · Regional Conservation Board approval

06

Construction and Supervision

The construction stage is the process of producing the exact counterpart of the approved project on site. Door, window, cupboard and stair details were drawn at working scale, and the frame, sill and stone-wall junction details of the timber joinery were defined individually.

Traditional construction details at working scale

DOOR AND WINDOW DETAILS — District 4, Parcel 1665
DOOR AND WINDOW DETAILS
STAIR AND FLOOR DETAILS — District 4, Parcel 1665
STAIR AND FLOOR DETAILS

BasisVenice Charter art. 16 · Construction supervision and archiving

Typology of Building Elements

TYPOLOGY 1

Hipped Roof Clad in Alaturka Tiles

Because Antakya has heavy rainfall, roofs are steep and pitched; all are hipped roofs clad in alaturka tiles. The eaves project over both courtyard and street, giving shade and protecting the walls from rain. All of the upper-floor rooms sit directly beneath the timber roof.

Roof plan — reconstruction
Roof plan — reconstruction
TYPOLOGY 2

Arched Stone Entrance Door

The element that establishes the relationship between street and house is the entrance door set within the thick, blank courtyard wall. On the Halk Sokak elevation this opening is framed in ashlar and spanned by a semicircular arch. The door leads directly into the courtyard; there is no intermediate space between street and courtyard.

Door details — reconstruction
Door details — reconstruction
TYPOLOGY 3

Timber-Framed Windows

The windows are double-leaf units built with box-section timber profiles. The ground floor windows are smaller and framed in ashlar, while the upper floor windows form wider openings together with the timber oriel and gallery arrangement.

Window and joinery details — reconstruction
Window and joinery details — reconstruction
TYPOLOGY 4

The Courtyard’s External Stair

Access to the upper floor is by an external stair rising within the courtyard. The stair is not only a circulation element: the space beneath it becomes storage or a shaded area and its landing becomes part of courtyard life; above, it connects to the timber gallery that serves the hall.

Stair details — reconstruction
Stair details — reconstruction
TYPOLOGY 5

The Courtyard — Centre of the House

At 139 m², the courtyard of this house is far larger than usual and is unquestionably the centre of the plan. With its ashlar paving, the rooms arranged around it and the timber gallery above, it works like a “sofa” hall linking every unit; through the long summer, much of daily life is spent here.

Ground floor plan — reconstruction
Ground floor plan — reconstruction
TYPOLOGY 6

Mixed Construction System and Silhouette

The walls are built as a three-layer section of 20 cm rubble-stone masonry, 10 cm fill and 20 cm ashlar facing, with bağdadi lath-and-plaster and brick used for the internal partitions. The ground floor carries the weight of stone, the upper floor the lightness of timber; in this language the building joins the Halk Sokak silhouette.

Wall types — reconstruction
Wall types — reconstruction

Project Sheets

Excavation Survey Sheets

Scaled documentation of the traces revealed during debris removal

  • EXCAVATION PLAN
  • SECTION AA
  • SECTION BB
  • FRENCH SHEET AND CADASTRAL SITUATION
  • SITE PLAN
  • LICENSED SURVEY (LİHKAB) BOUNDARY

Restitution — Plans

Evidence-based redrawing of the building’s original spatial organisation

  • GROUND FLOOR PLAN
  • FIRST FLOOR PLAN
  • GROUND FLOOR STRUCTURE PLAN
  • FIRST FLOOR STRUCTURE PLAN
  • GROUND FLOOR CEILING PLAN
  • FIRST FLOOR CEILING PLAN
  • ROOF PLAN
  • FRENCH SHEET AND CADASTRAL SITUATION
  • SITE PLAN
  • LICENSED SURVEY (LİHKAB) BOUNDARY
  • MATERIAL AND RELIABILITY LEGEND

Restitution — Elevations and Sections

Its place in the street silhouette and the vertical spatial organisation

  • HALK SOKAK ELEVATION
  • SECTION AA
  • SECTION BB
  • SECTION CC
  • SECTION DD
  • SECTION EE

Restitution — Architectural Details

Documenting doors, windows and timber elements

  • WINDOW AND DOOR DETAILS
  • JOINERY DETAILS
  • TIMBER DOOR DETAILS

Reconstruction — Plans

The plan level of the document-based rebuilding decisions

  • GROUND FLOOR PLAN
  • FIRST FLOOR PLAN
  • GROUND FLOOR STRUCTURE PLAN
  • FIRST FLOOR STRUCTURE PLAN
  • GROUND FLOOR CEILING PLAN
  • FIRST FLOOR CEILING PLAN
  • ROOF PLAN
  • ROOM SCHEDULE
  • FRENCH SHEET AND CADASTRAL SITUATION
  • SITE PLAN
  • LICENSED SURVEY (LİHKAB) BOUNDARY

Reconstruction — Elevations and Sections

Re-establishing the original building envelope and facade order

  • HALK SOKAK ELEVATION
  • SECTION AA
  • SECTION BB
  • SECTION CC
  • SECTION DD
  • SECTION EE
  • WALL TYPES

Reconstruction — Construction Details

Traditional building techniques described at working scale

  • DOOR AND WINDOW DETAILS
  • JOINERY AND CUPBOARD DETAILS
  • STAIR AND FLOOR DETAILS

Project Team

  • Yonca Yılmaz Çelebi
    M.Arch · Conservation Specialist
  • Burcu Özlüoğlu
    Architect
  • Eda Yabancı
    Conservator

Method and Sources

The sequence followed in this file — documentation, diagnosis, evidence-based restitution, repair with minimum intervention — is the established method of the conservation literature. Intervention decisions were taken on the principles that repair must not begin before the cause of damage has been diagnosed, and that the degree of intervention rises from consolidation towards reconstruction only as far as necessity requires. For the theoretical framework see Zeynep Ahunbay, Tarihi Çevre Koruma ve Restorasyon (YEM Yayın, 2009); for the principles, the Venice Charter (1964), the Nara Document on Authenticity (1994) and Turkish Law No. 2863 on the Conservation of Cultural and Natural Property.